Hi gents I m looking for info comments advice that will help me look knowledgeable to my boss (money man) northen power grid. & mep consultant .
I have been given a project to split 26 student clusters (6 bed) into 54 x 2 bed flats. current supply and metering to each student cluster is as per photograph. I have asked northan power grid to give me an additional 28 MPANs and im awaiting a price.
Will i simply be able to split existing 3 phase supply 1 phase to each flat for economy 7 water and space heating (say 6 x 16amp circuits per flat) then split 3rd phase== power 32 a lighting 6a and shower 40a cooking 32a (separate kitchen power + smoke would be nice) will diversity give me this.
your thoughts on a better conflagration and any recommended equipment to install to reduce energy use or make the installation easy would be nice.
Work is in Newcastle probably to be completed by xmas and could possibly be organised as a hospital job if anyone is interested in having a look at it./ pricing it. there will be emergency lighting and a potential to crawl about in existing ceiling voids etc etc in the block etc as well

I have been given a project to split 26 student clusters (6 bed) into 54 x 2 bed flats. current supply and metering to each student cluster is as per photograph. I have asked northan power grid to give me an additional 28 MPANs and im awaiting a price.
Will i simply be able to split existing 3 phase supply 1 phase to each flat for economy 7 water and space heating (say 6 x 16amp circuits per flat) then split 3rd phase== power 32 a lighting 6a and shower 40a cooking 32a (separate kitchen power + smoke would be nice) will diversity give me this.
your thoughts on a better conflagration and any recommended equipment to install to reduce energy use or make the installation easy would be nice.
Work is in Newcastle probably to be completed by xmas and could possibly be organised as a hospital job if anyone is interested in having a look at it./ pricing it. there will be emergency lighting and a potential to crawl about in existing ceiling voids etc etc in the block etc as well