I have installed a circuit for an oven and carried out all of the relevant testing so far. Apart from a neon on the double pole isolation switch, there is no current using equipment connected to the circuit yet as the property is empty. In this situation, would one just make a note on the electrical installation certificate, that there is nothing connected to the circuit yet or would you perform stage 2 of the insulation resistance test, just for the sake of the neon?