Hi Everyone
The utility supply for an installation is of TT system.
The Generator start point is connected to the its frame and earthed to an electrode. Thus, the installation has its own earthing electrode.
I would like to know whether the installation is a TT or TN-S system when the standby generator is in operation.
The utility supply for an installation is of TT system.
The Generator start point is connected to the its frame and earthed to an electrode. Thus, the installation has its own earthing electrode.
I would like to know whether the installation is a TT or TN-S system when the standby generator is in operation.