has anyone worked on really strict sites

im currently testing on the largest site ive ever worked on in Runcorn, where 'whistleblowers' are rewarded with offers of flat screen tellies, meal vouchers etc. There's been 2 strikes so far...
 
has anyone worked on really strict sites

im currently testing on the largest site ive ever worked on in Runcorn, where 'whistleblowers' are rewarded with offers of flat screen tellies, meal vouchers etc. There's been 2 strikes so far...
depends on what you mean by really strict sites.

im guessing the usual, gloves,glasses,hardhat etc.

no steps,ladders etc and permits for everything inc going for a $hit
 
I worked on the Channel tunnel and that was strict in the H&S manner that shanky above reflects on. You could/would be faced with instant dismissal for not wearing glasses ect. There was also £1000+ rewards on offer for information leading to the sacking of personell who were found to be indulging in sabotage.....which was quite rife for a time down there due to the wages being good and nobody wanting it to end lol. Personally I just kept my nose clean glasses on and head down and got on with my job...let the managers manage.
 
thats it, hard hat gloves and glasses. permits for everything, rams, 4 hour induction, spot checks every day, no stanley knives, no steps-podiums only, no radios, no food or drink, long-sleeved clothing at all times, no jewellery.
the job itself is brilliant, i love it. the rules are a bit crazy though!
 
thats it, hard hat gloves and glasses. permits for everything, rams, 4 hour induction, spot checks every day, no stanley knives, no steps-podiums only, no radios, no food or drink, long-sleeved clothing at all times, no jewellery.
the job itself is brilliant, i love it. the rules are a bit crazy though!
no problem for me, i dont use any stanley tools XD

surely an electricians knife is more dangerous?

it has only taken me 5-10mins to sharpen a folding knife through

dmt,1k,4k then 8k 8k= razor sharp e.g. i would shave with it
 
Last edited:
thats it, hard hat gloves and glasses. permits for everything, rams, 4 hour induction, spot checks every day, no stanley knives, no steps-podiums only, no radios, no food or drink, long-sleeved clothing at all times, no jewellery.
the job itself is brilliant, i love it. the rules are a bit crazy though!

no way would i tolerate miserable & inflexible working conditions such as these for 5 seconds , the moneys irrelevent.

Thats what happens when the bigger contractors of the UK embrace the over zealous H&S mantra.

in fact i've quit jobs with a more relaxed atmosphere than that.
 
also no phones on site. no exceptions
and as of next week when im live testing, its rubber mat, permist to test live, insulated gauntlets, safe isolation supervised by H&S, barriers, no lone working. im a bag of nerves! then there's the red card system: yellow card = warning, another yellow card= 3 month site ban, red card= permanent ban. and a few have been banned already!
 
also no phones on site. no exceptions
and as of next week when im live testing, its rubber mat, permist to test live, insulated gauntlets, safe isolation supervised by H&S, barriers, no lone working. im a bag of nerves! then there's the red card system: yellow card = warning, another yellow card= 3 month site ban, red card= permanent ban. and a few have been banned already!

in other words , 2 hours of prep for a 10 second earth loop test........

the worlds gone f******* mad lol
 
also no phones on site. no exceptions
and as of next week when im live testing, its rubber mat, permist to test live, insulated gauntlets, safe isolation supervised by H&S, barriers, no lone working. im a bag of nerves! then there's the red card system: yellow card = warning, another yellow card= 3 month site ban, red card= permanent ban. and a few have been banned already!
i wouldnt work there.

why do you need insulated gauntlets to test?

we had that but because of where it was fed from we enjoyed telling them we would have to isolate the whole site XD.

one of the jobs we are working on will be a right laugh soon.

ok old system ripped out and new installed off new bms panel, patients transfered to the finished isolation rooms, phase 2 rip out old and then install into running bms panel with patients in isolation ward fed from panel.


how do you test and commision the system?

we are not allowed in the wards till patients have been removed and the rooms have been sterilised with hydrogen peroxcide etc
 
And the REAL cost of all these draconian rules?? (and in many cases unofficial ones at that) ...Probably 3 times that of a standard H&S ruled project. Someone, somewhere, somehow is making a wedge, ...of that i am certain!! lol!!
 
PPE is supposed to be a last resort to be taken when hazards cannot be removed. Instead, it's used stupidly. Baileys a few years back had a policy that gloves were to be worn at all times but because it's tricky to terminate cables with gloves on we could cut the fingers out of them.
So what the hell was the point of the gloves?
 

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Green 2 Go Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses Heating 2 Go
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread starter

Joined
Location
shotton, flintshire

Thread Information

Title
strict sites
Prefix
N/A
Forum
UK Electrical Forum
Start date
Last reply date
Replies
149
Unsolved
--

Advert

Thread statistics

Created
Dean Williams,
Last reply from
flyingsausage,
Replies
149
Views
13,763

Advert

Back
Top