how do you work out the size of cpc supplying a sub main? and is it the same method for working out the main earthing conductor size?
cheers in advance
cheers in advance
Last edited:
so all G/Y cables to the electrode should be 16 mm as it ends up being buried?
think i'll go with 6mm G/Y buried, as long as pefc works out ok i cant see i problem,
sorry never knew they were called earth pits
test continuity between met and said pipework ?