Leesparkykent
Nearly Esteemed
Hi all....I’ve got a block of flats I’m doing the M&E on. It’s just design stages atm and there is a basement where the central boiler system and switch room is going. The problem I’m having here is that this is the far left hand side of the building and the riser is pretty central. Far from ideal but I’m running out of options and would like to run tray through the ceiling void between ground and 1st floor which is essentially a fire rated, plasterboard, dropped ceiling in one or two of the ground floor flats. Can anyone think of a reg/building reg that would prevent this. This is a conversion of a private school to 18 high end flats. Thanks