Got a real pain of a Client who keeps changing there mind and not listening to me
I am putting a New Small DB in to a new extension and was going to run a 3 core 10mm SWA cable to it from the meterbox. The run was nice, along the outside wall through a hole and up a utility room wall.
However they now want me to resite the new DB to a porch. The most Direct, Shortest and simple route to the new porch area is across the new Kitchen Slab Floor before the Screed goes down. The Floor will also have hot water underfloor heating in it
Was wondering any comments on the floor solution as the alternative to avoid the floor is a very long external wall and trenching run
I am putting a New Small DB in to a new extension and was going to run a 3 core 10mm SWA cable to it from the meterbox. The run was nice, along the outside wall through a hole and up a utility room wall.
However they now want me to resite the new DB to a porch. The most Direct, Shortest and simple route to the new porch area is across the new Kitchen Slab Floor before the Screed goes down. The Floor will also have hot water underfloor heating in it
Was wondering any comments on the floor solution as the alternative to avoid the floor is a very long external wall and trenching run