OP
Engineer54
Cant you just do a loop test when everything is up and running and all extraneous metal earthed by 10mm back to the met in the dwelling
Already been stated by the O/P that there is No extraneous metalwork/services within the shed...
Therefore no requirement for any 10mm bonding conductors on this installation!!
But i would personally still install a 3 core cable as a CPC, and still use the earthed armouring too....lol!!