dazj90

-
Joined
Nov 5, 2015
Messages
53
Reaction score
3
Location
Nottinghamshire
We've got a shot blasting booth with a steel working platform inside, bolted to this platform are 4 x LED floodlights (mounted inside a steel enclosure with tempered glass door).
They are wired up with SWA cable which is clipped to the underside of the platform.
Is there any regulations regarding installing power cable to shot blasting booths?
 
Outside of direct line of fire, I'll see if I can take some photos.
New installation, blast booth has only worked for a few hours since cable was installed and doesn't look like any damage
 
There are probably lots of Regulations that are applicable, but I am not aware of any that are specifically for shot blasting booths.
I would not be too worried about the cable, in my experience, plastic, rubber and other material such as fibre washers are not damaged by the shot.
 
[ElectriciansForums.net] SWA Installed inside Shot Blasting Booth

[ElectriciansForums.net] SWA Installed inside Shot Blasting Booth


[ElectriciansForums.net] SWA Installed inside Shot Blasting Booth


[ElectriciansForums.net] SWA Installed inside Shot Blasting Booth


[ElectriciansForums.net] SWA Installed inside Shot Blasting Booth


Would this warrant a full installation certificate (addition to existing installation)?
 
The issue I would have with this install is heat, those enclosures will not allow the led floodlights to cool via natural convection, I would say there life expectancy will be severely shortened?

Bit of a rough install. Not keen on the adaptable box abouve the switch.
 
It would warrant an installation certificate if it is a new circuit.
It would warrant a minor work's installation certificate I f it is an addition or alteration to an existing circuit.
 
Agree with the heat but couldn't really see any other way of protecting floodlights in the harsh environment.
It'll be an installation certificate then, installed 1A MCB inside blastbooth control panel feeding the new lighting circuit.
 

Reply to SWA Installed inside Shot Blasting Booth in the Talk Electrician area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
279
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
776
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
789

Similar threads

Yes, that was actually something making me uncomfortable too, the bonding of it all. I need to have another look at it, I'm not sure if the...
Replies
2
Views
824

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top