R

Roddie82

Hi I am currently working on a Biomass installation on a farm which will be servicing two houses and a fan blower. I need to be able to run the main pump in the boiler room when demand is called for from any of these 3 systems. 1 house is over 150m away with the other 90m in the opposite direction. What I am trying to consider is how this can be done without back feeding on the lives, I am new to heating installations of this size and any help would be appreciated.

Thanks

Rodders82
 
Most likely like jack described a district system. Usual setup is biomass boiler feeding buffer. From buffer to district pump.One district pump I should imagine with only feeding 2 houses. Pending on manufacture of boiler, all these can be wired back to boiler and controlled via biomass boiler controls. Treat the heat exchangers in the houses as conventional boilers and usually wired as S plans supplyed from local supply.
I would expect this system also boiler feeding buffer tank in feeding to house heat exchangers 24/7 regardless of property demand. Each property then drawing as required from heat exchangers on demand from house heating controls.
 
The pump is being run independently so that there is minimal disruption to the controls at each plot as it is existing houses with heating systems already installed. Forget about the boiler and it's set up completely. All I want to do is have 4 independent circuits that are able to switch a two port valve at each plot which then brings on a pump when called upon from any plots.
 
Just an idea, could you fit a precision flow meter with an output signal or flow switch so when the pumps inside each property kicks in when calling for heat the flow switch/meter detects the flow and the signal activates the main pump in the boiler room? Obviously there would be some calculations involved for sufficient flow to trigger the flow switch/meter etc.
 
Last edited:

Reply to Switching for Biomass in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
433
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
1K
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
1K

Similar threads

I'm just trying to understand the current your suggested relay needs to handle. Surely the above is not the running current of the lamp? That...
Replies
2
Views
245
Has the cover been removed, is it TP bussbar? I fitted one as @oscar21 linked to a few months ago, it was actually a nice board and with the TP...
Replies
5
Views
663

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top