Hi guys
Customer wants a supply to a large table in the center of a room only 2 double sockets. Timber A frame roof above about 6ft. Any advice about the best way of going about it i was thinking switched fuse spur in roof and flex running inside some kind of chrome tube down to the table.
Customer wants a supply to a large table in the center of a room only 2 double sockets. Timber A frame roof above about 6ft. Any advice about the best way of going about it i was thinking switched fuse spur in roof and flex running inside some kind of chrome tube down to the table.