Terrible work connected to my install. | on ElectriciansForums

Discuss Terrible work connected to my install. in the Australia area at ElectriciansForums.net

A

ajbelec

Hi All,

This is my first post here, i've found this forum very helpful, so I'm hoping for some advice from those of you who may have been in my situation.

I have rewired a large house, including a sub main with 3 way board on the end of it for an air source heating system.

The problem I have is this - the 'defined scope' installer who has carried out the electrical work for the heating system has lashed it in.

For instance - SWA simply inserted into the board through 20mm knock out - no gland, the other end is in a PVC compression gland steel wire exposed. Therefore no earthing to armour.

No identification of cables, no isolator for boiler or immersion - oh and no labels on the board.

I don't really want to put this right myself, as it has been paid for already.

I haven't mentioned this situation to the client yet, I think I will first call the installer and 'ask when they intend to finish'.

Is it worth calling their governing body and asking them about it or am I just on a hiding to nothing?

I don't want this cr*p work on my job!!

All opinions welcomed.

Thanks,

Andy.
 
Phone up the installer and tell you have got to disconnect their supplies ( quoting non compliance ) and ask them how long it will be before the faults are recified
so as to allow you to notify client
 
Not my post but I'll answer - One end only so that you don't get parrallel earth paths, thus needing twice the fault current to trip the circuit...

Think thats something like right, or atleast thats what my old guv'nor told me when I was an apprentice.
 
Not my post but I'll answer - One end only so that you don't get parrallel earth paths, thus needing twice the fault current to trip the circuit...

What are you saying here, that you don't connect the cables SWA to the steel box or earthing arrangement down stream??? Need twice the fault current to trip the circuit?? Am i missing something here or what???
 
Ive moved an RCBO fitted for a solar invertor that had been fitted on an RCD protected bus bar. I called the installer (full scope) and they just said " error on their part, can I please move and bill them". Just simple lack of thought........

I concurr, call their defined scope body
 

Reply to Terrible work connected to my install. in the Australia area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
438
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
1K
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
1K

Similar threads

  • Question
I had an interesting little job this morning. Three sockets in an extension were not working and haven't worked for quite some time (years). It...
    • Like
    • Winner
Replies
0
Views
687
Thanks all for your comments, advice and suggestions. The following is probably pretty boring for most, and is simply a summary of how the job...
Replies
8
Views
896

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top