test results question | Page 2 | on ElectriciansForums

Discuss test results question in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net

Beat me to it Dillb, to many people think these scams are the B all and end all
[h=2]
[ElectriciansForums.net] test results question
Re: Things that make your blood boil...[/h]
Bad Grammar / spelling / / text talk / punctuation. there meaning their's, no meaning I know how to do it, in general the very poor standard of basic English coming out of schools these days, I'm old school so that's my excuse.​



  • Sorry Pete, couldn't resist!:)

 
[ElectriciansForums.net] test results question
Re: Things that make your blood boil...

Bad Grammar / spelling / / text talk / punctuation. there meaning their's, no meaning I know how to do it, in general the very poor standard of basic English coming out of schools these days, I'm old school so that's my excuse.​



  • Sorry Pete, couldn't resist!:)


Know wurries m8 I is gettin old, it's only one O, and I did it on purpose to see who was awake, and if you believe that you will believe anything.
 
Last edited:
I would tend to put in the remarks on the test results sheet, "all recorded values are directly measured values".
The only calculation I can think that he could do is using Zs= Ze+ R1+R2 and this will never match the measured Zs as they are different measurements.
However if he wants this as a calculation then Zs=Ze+R1+R2 is the worst case scenario so you could just not record the measured Zs.
I cannot remember what NICEIC fabricated for their forms or what they specify in terms of results.
 
All he says to me is that my results aren't right when he calculates them

They wont be, he is obviously a numpty. Measured test results will always be a tad lower than calculated due to parallel paths, and in some cases they will be a lot lower.

Tell him to leave it to someone who knows what they are doing.....YOU, and advise him that he needs to do the Insp and test courses.

Cheers..............Howard
 
No the qs basically took all th testing and gave it to another guy to do, to be honest I'm not that bothered he can have all the grief about it as I'm not listened too and talked to like I'm fresh out of my apprenticeship

I have a good mate probably just like you, a QS good and conscientious, no one listened to him so eventually he left the company got binned by the NIC, because of all the crap they did, now there's a first.
 

Reply to test results question in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
As the holiday season approaches, PCBWay is thrilled to announce their Christmas & New Year Promotions! Whether you’re an engineer or an...
Replies
0
Views
523
  • Article
Bloody Hell! Wishing you a speedy recovery and hope (if) anyone else involved is ok. Ivan
    • Friendly
    • Like
Replies
13
Views
982
  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
915

Similar threads

For a new circuit or alteration the dead tests should be done first to ensure it is safe to energise.
Replies
3
Views
320
  • Solved
There is an article about that here: https://www.cement.org/learn/concrete-technology/durability/corrosion-of-embedded-materials It states...
2
Replies
27
Views
3K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top