TT system, existing three phase fuse board recently installed by another spark which only has single phase circuits terminated into individual RCBOs
Required to install three phase circuits for new equipment, is there a better way of doing this than fitting a 4pole RCD ahead of the main switch?
Conscious that this is going to cause total loss of power if a problem ever occurs.
No space nearby to install a seperate DB for the three phase equipment only.
Required to install three phase circuits for new equipment, is there a better way of doing this than fitting a 4pole RCD ahead of the main switch?
Conscious that this is going to cause total loss of power if a problem ever occurs.
No space nearby to install a seperate DB for the three phase equipment only.