Hi guys,

i had a look at a building in the west end of london which is spilt into 10 flats this weekend to do some upgrading works to the landlord area.

i noticed that there was originally 6 flats and the landlord must of added an addition 4 flats on top. Called 10 9 8 7. ( obviously).

The issue is that there has been a 3 phase submain wired in swa from the ground floor ryefield board . Which is then terminated into a 3 phase board installed outside flat 10/9 . From this board they have wired the two flats using all three phases therefore giving a potential of 400v across the circuits installed into the flats!!

i.e
flat 10 1L1 - lighting
flat 10 1l2 - smoke alarms
flat 10 1l3 - sockets
flat 10 2L1 - cooker

flat 9 is the same i.e
3L1 lighting
3l2 smokes etc etc!

this senario is the same for flat 8 7 !

im sure this is hugely wrong!!!
 
then he's no business messing with things he does not understand. anyway he's just as likely to die from 240V as he is from 415V. just that 415V might be a tad quicker.

That amuses me when people say that. Just cause three phase is present it does not mean they will receive a 415V shock. They will get L1 or L2 or L3 to earth @ 240V. Someone would have to be an absolute moron to put themselves across two phases to receive 415V.
 
That amuses me when people say that. Just cause three phase is present it does not mean they will receive a 415V shock. They will get L1 or L2 or L3 to earth @ 240V. Someone would have to be an absolute moron to put themselves across two phases to receive 415V.

trouble is, a lot of users are absolute morons
 
The load balancing is cr@p. If there’s ten flats with say 5 sub-boards the balancing should be coordinated across all boards. Not difficult if you take the time to work through it logically.

As for the 400V on lighting, unless the light switches for flat 10 are in flat 9 where’s the problem? As long as each flat is a separate entity there is no problem.
 

Reply to Three phase supplying a domestic flat. in the Domestic Electrician Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
228
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
687
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
644

Similar threads

Echo above, as someone who's probably similarly inexperienced I have set myself up a per point spreadsheet and whack it all in there. This has...
Replies
9
Views
561
  • Question
if the 3 spaces with charge points are always allocated to the same 3 flats, surely the easiest way is to run the supply to the load side of the...
Replies
9
Views
883

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top