Hi Guys,
A Metalcad CU is being installed on a TT system in a farm garage. Chances arew things will be rested up against the walls so a Metalclad CU has been chosen to give it protection.

All circuits will be protected by 30mA RCD / RCBO.

From research it seems a 100mA time delayed RCD will be needed to protect the tails entering the metalclad CU.

My next thought was that the time delayed RCD will need a Metalclad enclosure to give it the mechanical protection.

Surely then the tails entering the enclosure will also need RCD protection?

Whats the best way to get the mechanical protection needed for this system?

Thanks in advance!
 
Measures can be taken to be sure there is no possibility of a short from the tails to the metal case.This would mean a clamped plastic bush,fixing the tails so they cant move...and mounting the RCD itself on an insulated packing board within the metal enclosure. If those measures were in place the metal enclosure would not require earthing.
A simpler alternative would be to use insulated enclosures and build mechanical protection around them.
 

Reply to Time delayed RCD to protect tails entering a metalclad CU in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Sticky
  • Article
Wicked I've just actually looked through it and it's very smart. Some good stuff in it. There's a tile association company that do a magazine...
Replies
2
Views
290
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
276
  • Article
Hi everyone, Another weekend, another sale! Get ready for colder days with Haverland Radiators, combining efficiency with modern design. Keep...
Replies
0
Views
354

Similar threads

Also use a tails gland and clamp if available and make sure tails are secured to a wall. The danger here is a live to earth fault in the Consumer Unit
Replies
7
Views
536
  • Question
much more information required. Is the supply to the first building a DNO supply or a sub main cable from another building ? if it is a sub main...
Replies
5
Views
928

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top