Hi
One day i will be able to contribute a bit more than just asking questions - sorry...
A customer of mine has some alterations to an existing installation, where by we will have to install a new 25mm TPN supply from the DNO to a point circa 25m away. The cable run is on private property and not accessible to the general public, is mostly on a steep incline (bank going from top to bottom) and will run adjacent a rough stepped path cut into the ground. The area has a fair amount of trees, bushes and grass.
His preference is to lay the cable on the surface of the ground, not bury nor suspend.
I am pretty sure i will not change his mind.
What precautions can i take to minimise the risk of injury? I am planning to install a delayed 100mA 4 poll RCD at the DNO in case something unexpected happens along the length of the cable. I could also insist that he puts up signage along the path of the cable, warning electrical cable etc etc.
Is there anything else I can / should do?
Thanks
John
One day i will be able to contribute a bit more than just asking questions - sorry...
A customer of mine has some alterations to an existing installation, where by we will have to install a new 25mm TPN supply from the DNO to a point circa 25m away. The cable run is on private property and not accessible to the general public, is mostly on a steep incline (bank going from top to bottom) and will run adjacent a rough stepped path cut into the ground. The area has a fair amount of trees, bushes and grass.
His preference is to lay the cable on the surface of the ground, not bury nor suspend.
I am pretty sure i will not change his mind.
What precautions can i take to minimise the risk of injury? I am planning to install a delayed 100mA 4 poll RCD at the DNO in case something unexpected happens along the length of the cable. I could also insist that he puts up signage along the path of the cable, warning electrical cable etc etc.
Is there anything else I can / should do?
Thanks
John