OP
bugsy
Use proper steel screed trunking
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Discuss Trunking in Floor Chase in the Talk Electrician area at ElectriciansForums.net
Now I think about it the floors I've been involved with have about 80mm screed. I believe the regs say the containment should be suitable for the intended use of the floor (522.6.4), the design in these cases being by engineers for large electrical contractors.
the op did say at less than 50 mm, beyond 50 mm then yes suitable for intended use is fine .
Reply to Trunking in Floor Chase in the Talk Electrician area at ElectriciansForums.net