Hi guys,
New job looking at. I haven’t been to site yet, but this is the scenario.
DNO just put a new single phase supply into a field PME. Line and neutral tails terminated into a double pole isolator/ no earthing cable installed yet/ no cu connected yet.
I have been asked to fit board and a few circuits to sockets and a caravan initially then quote for bigger installation.
2 barns are to be built on site one with an office in it.
Barns are for storage of food only. No livestock.
So 3 different special locations- construction/ agriculture/ caravan
My thinking is to just TT the installation for all 3 stages.
TBH I don’t normally do agricultural and very little caravan stuff. Other than what’s in the BBB that I have just re read (not the whole book, just the relevant locations) Are there any hints or tips on offer?
The job seems simple enough and it’s not what I know I’m concerned about it’s what I don’t know I don’t know.
Cheers
New job looking at. I haven’t been to site yet, but this is the scenario.
DNO just put a new single phase supply into a field PME. Line and neutral tails terminated into a double pole isolator/ no earthing cable installed yet/ no cu connected yet.
I have been asked to fit board and a few circuits to sockets and a caravan initially then quote for bigger installation.
2 barns are to be built on site one with an office in it.
Barns are for storage of food only. No livestock.
So 3 different special locations- construction/ agriculture/ caravan
My thinking is to just TT the installation for all 3 stages.
TBH I don’t normally do agricultural and very little caravan stuff. Other than what’s in the BBB that I have just re read (not the whole book, just the relevant locations) Are there any hints or tips on offer?
The job seems simple enough and it’s not what I know I’m concerned about it’s what I don’t know I don’t know.
Cheers