I was looking at a job the other day which had a recent minor works cert which had the arrangement down as TT.
On further invesigation I discovered that the 16mm earth cable did indeed leave the building but went up the wall outside and was connected into a 3 wire overhead supply.
I am presuming this is TNS or am I barking up the wrong wall?