Y

yelloperil

I am installing a consumer unit on a TT system, The "ON site Guide" says it must have a 100ma time delayed RCD as its main isolation switch, but I have since been told that this has changed and I can use a standard 30ma RCD. Which one is correct?
 
Hi, If you are installing a new consumer unit onto a TT installation I would assume that it is a Dual RCD protected CU with an RCD as the main switch incorporated within the CU.
 

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Green 2 Go Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses Heating 2 Go Electrician Workwear Supplier
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread Information

Title
TT System main isolator switch
Prefix
N/A
Forum
Australia
Start date
Last reply date
Replies
1
Unsolved
--

Advert

Thread statistics

Created
yelloperil,
Last reply from
chloebear,
Replies
1
Views
2,899

Advert

Back
Top