amlu
-
without seeing the job. my first thought would be split the tails, 16mm SWA to 2nd CU, then treat extension as a separate set of finals. run the shower from the C/H boiler, then that's 40A that you can forget. fit a 80A KMF for the 2nd CU, ans a 100A isolatoer before your henleys, so there's single point isolation for the whole property.
^^^that, its under ÂŁ200 in materials if you shop around. not a massive sum and will make your job easier. plus people living in the extension wont have to knock on others door if something trips etc...