T
thomas-1981
Hi all. I've done an install and carried out all tests except Ze. The site is a large electronics factory. The install is supplied from a sub board but the board supplies equipment required to be on 24/7. I've heard about contacting the DNO. Any advice would be appreciated. Thomas