Had a quote to do today. Simple job, a doorbell (built in transformer and chime jobby)
Best option is to feed of the ring with switched fcu.
I took a look at the installation and noticed quite a few problems. No bonding, no rcd protection, CU right next to the gas meter, 3036 fuses etc
Zs on the ring measured 0.61ohms, PFC measured 951A, TNCS earthing arrangement.
I've informed the home owners of my findings, however is that where my responsibility for the installation ends if I do undertake the work and all my test results are good?