Good afternoon everyone, I am Alex and I'm new here.

I am posting this to ask for advice with how I should approach this situation.

We called in an electrician, and as confirmed in writing by messages, the original request was to change the socket covers and change lightbulbs through the flat (1 bedroom flat). After completing the job, the electrician sends us an invoice which lists the labour and material costs, and a rough breakdown of the works done. The final bill is OVER ÂŁ2,000 (almost all of it labour) and lists 30 hours of work. On top of the requested works, it also details a lot of other works, which were not requested nor authorised by us, including various tests and other changes. To make the situation more difficult, we were away during this time as the flat was under renovation and could not confirm what works exactly have been at the time.

Given this extremely unreasonable bill, what is the best way to approach the situation?

Any help would be appreciated, and thank you for your advice.
 
Can I ask something from everyone, given the additional works he claims to have completed without our knowledge or consent (like removing wiring and changing smoke alarms) without providing full details, and involving other people in our flat without our knowledge, is this even legal? Of course I do not want to escalate this to court, however I would also like to know if that is something the electrician should even be worried about, assuming he refuses to be reasonable.
 
The electrician is not solo, from what I understand he works for a company which is NICEIC Approved. We contacted him directly, and I do not know where the other 3 people came from, nor that there was anyone else involved until the invoice.
This a case where you got spark that works for a company, so to be honest.
You are employing him direct.
So the argument is tell him to reduce your Invoice or if he takes you to court
The he better to explain to a judge if he is employed to a company or other.
Ask him one simple question vat or no vat,and wait.
I do litigation on my part time job.
 
This a case where you got spark that works for a company, so to be honest.
You are employing him direct.
So the argument is tell him to reduce your Invoice or if he takes you to court
The he better to explain to a judge if he is employed to a company or other.
Ask him one simple question vat or no vat,and wait.
I do litigation on my part time job.
He did include +20% VAT to the bill, the invoice has the company name and account details.
 
I will only work 2 ways

1. formal quotation detailing what work to be done with a (fixed price) or (per hour labour cost and estimated time).
(all new customers will come in this bracket)

2. friendly chat with customer detailing what needs doing, point out the possible pit falls that may be encountered and rough costs if the worst happens.

I do feel sorry for both domestic sparks and there customers as poor communication and other issues can quickly sour what was originally a simple business deal.

hopefully you have not got to a point where the communications are failing, so you need to press on and discover what the issues are on each side of the table and come to an arrangement that you are both comfortable with.
it is likely to be somewhere in the middle of 10 and 30 hours of labour.

keep it to facts and don't let emotions get in the way of coming to an arrangement.
 
I will only work 2 ways

1. formal quotation detailing what work to be done with a (fixed price) or (per hour labour cost and estimated time).
(all new customers will come in this bracket)

2. friendly chat with customer detailing what needs doing, point out the possible pit falls that may be encountered and rough costs if the worst happens.

I do feel sorry for both domestic sparks and there customers as poor communication and other issues can quickly sour what was originally a simple business deal.

hopefully you have not got to a point where the communications are failing, so you need to press on and discover what the issues are on each side of the table and come to an arrangement that you are both comfortable with.
it is likely to be somewhere in the middle of 10 and 30 hours of labour.

keep it to facts and don't let emotions get in the way of coming to an arrangement.
Thank you for the advise James. To be honest considering we originally asked him to only do a small job, change lights and socket covers, even 10 hours seems like is a lot, however I am definitely not an expert here.
 
Thank you for the advise James. To be honest considering we originally asked him to only do a small job, change lights and socket covers, even 10 hours seems like is a lot, however I am definitely not an expert here.
It is a bit of a guess and not to be taken literally, just take the spirit of the post and adjust it to suit your particular issues.

I will say however that it can take 30 min to change a single downlight if things don't go well or you encounter a problem.

I would assume it would take me 20 min to change a socket, downlight, light pendant, light switch, fused spur etc. if I was quoting a job.
 
4 days work seems excessive for the work listed,
ÂŁ200 material and 30 hours at ÂŁ60 (guessing here)

It is possible that when changing sockets or lights, a wiring fault was found that needed to be located and repaired or if there are a lot of downlights maybe some of the drivers needed changing.

I would start with a simple email.

Thanks for your invoice,
I am not happy with the invoice amount, the work we asked to be done was

1. change all socket faces to new crabtree white.
2.

It seems the job has taken a lot longer than estimated and i don't understand why.

I did ask for a written quote before the work started but you were unwilling to do so.
when we discussed the works required, i was led to believe that this would be a simple job that wouldn't take too long.

could you please provide me with a complete list of works done and if it was above and beyond the work requested, then could you explain why it was essential to be done without any consultation with myself.
"change all lamps and ensure they are working"


The issue could be this .If THIS was correct then its almost "permission" to carry out any works required ?
 
"change all lamps and ensure they are working"


The issue could be this .If THIS was correct then its almost "permission" to carry out any works required ?
like I said, follow the spirit of the post, not the exact wording.
 
However we confirmed the exact scope of works needed in writing.
well lets see a copy, I am always cautious when I see these threads, there is usually 2 sides to everything, lets see the work agreed in writing and then we can give you a proper opinion.
 
well lets see a copy, I am always cautious when I see these threads, there is usually 2 sides to everything, lets see the work agreed in writing and then we can give you a proper opinion.
same for me ...I get asked about issues a lot and I always say "Sow me the paperwork" . A huge amount of issues are caused by the old "cash in hand " mentality that the customer is also happy to be part of .And very very little paperwork SMS trail . So how can I say "its not good" when in fact its roughly what they asked for and paid for but now have seconds thoughts about.....
 
You state your location as London. Labour rates are very high there and there's also often parking and other vehicle surcharges so I'd be expecting a hefty labour amount. If his brief was to replace bulbs and get the lights all working that may have involved some fault finding and some fittings converting to LED's etc. Also just to replace the socket facia covers would be as much if not more expensive than complete new sockets if the replacement covers had to be special ordered or are a manufacturer discontinued item. If he converted halogen downlights to LED for example he would have been well within acceptable practices to do a circuit test afterwards if he disturbed the fittings.

Yes on the face of it the bill seems high but there's many reasons it could be more than you were expecting. First step is to ask for a full materials and labour breakdown then discuss it with him from there. Getting resolution to this kind of dispute is all about both parties communicating like grown ups.
 
Couple of important points, do not refuse to pay his bill, in fact it will support your stance if you make a "Without prejudice" payment of say 20% of his invoice, ask for a detailed breakdown of the works carried out, compare to the original brief and dispute those you disagree with, any correspondence should be by verified e-mail or recorded letter.
 

Reply to Unreasonably high invoice bill from an electrician in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Get better soon
    • Friendly
    • Like
Replies
10
Views
470
  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
751
  • Sticky
  • Article
Thanks so much for sharing this with us! I’ll definitely take a look, it seems like there are a lot of useful and interesting products. The idea...
    • Like
Replies
5
Views
2K

Similar threads

The challenge that you have with this is that you've no confirmed start point. Because you have a lack of an EICR you don't actually know what...
Replies
7
Views
700
Thanks all for your comments, advice and suggestions. The following is probably pretty boring for most, and is simply a summary of how the job...
Replies
8
Views
1K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top