Using bits of cable as busbar | Page 2 | on ElectriciansForums

Discuss Using bits of cable as busbar in the UK Electrical Forum area at ElectriciansForums.net

Joined
Jan 27, 2009
Messages
375
Reaction score
42
Location
N/A
Anybody else come across a lot of this, this is prob my 3 in a few months all in houses less than 10 years old

been to a house today and they was complaining lights flickering so they bought a new fitting for bathroom as this is where it was doing it most.

So fitted light new light and checked all terminals in each light all ok

check fuse board and they had used bits of 4mm instead of busbar in some places and where there was busbar it wasn't even sat in mcb properly which was causing the flickering so very lucky didn't arc to much


and before anybody says why change light before checking board they wanted light changing anyway
 
Only the single phase ones

I have even seen this in a 3ph board , but having said that it was a bit of a self build one anyway .[/QUOTE]

Me too, OK if the OCPD is up to it..... sub boards in commercial kitchens, 32amp from main db, at most. It's often a case of make something up to suit. Not ideal, but needs must.
 
The fact is the guy who installed the 4mm2 cable may not have had enough training, thats my point, and he may have thought he did a decent job without realising due to a short course and no real on site experience.

You really think a Electrical Trainee would make such a fundamental flaw?!? Even they have enough sense to know that making up a busbar out of 4mm is crap at best!

Mind you... When I re-read what I've just written... Hmm... I say no more :s
 
You really think a Electrical Trainee would make such a fundamental flaw?!? Even they have enough sense to know that making up a busbar out of 4mm is crap at best!

Mind you... When I re-read what I've just written... Hmm... I say no more :s

What! I've made some cracking busbar systems incorporating 4mm.......bar.
 
ive seen it in old multiple meter panels installed by power company feeding 3 flats
(removed during upgrade and installed separate service entrance for each meter)
we can install meter pans, and related equipment but the power co. has to be called to connect to the pole transformer
 
I've seen this a couple of times (single phase boards)

On both occasions it was where one extra MCB was installed at the end and the bus bar extended by a cable link.

If the cable is correctly sized for the load (that of the last MCB) and securely terminated - what's the problem?

Although I agree it looks a bit sh1te
 
I saw this just a few weeks ago. Large old 3-phase board in a huge warehouse. I forget the make of board but it had concealed busbars and removable links to connect to the mcbs. All the spare links had been removed years ago and lost etc so when new cirxuits were added the sparks just used 4mm singles to connect the mcb's.
 
It may LOOK rough, but so long as the cable in question is man enough for the job then I think in the electrical sense it's a tough one to argue, tbh. After all, an internal tails/RCD set is just tri-rate pre-chopped and formed to the right length. I think the far worse crime is where you've a board which has been so badly crammed in and stressed with cables over the terminations that you need to have a solid piece of metal below them just to keep them clamped together and straight!!

I once taught a naughty builder a lesson in paying his bills by walking off site carrying (my) primary bus bar from DB1 on a large install....returned 48hrs later to find that someone had strung 2.5TE between them all instead...madness!!!!
 
It may LOOK rough, but so long as the cable in question is man enough for the job then I think in the electrical sense it's a tough one to argue, tbh. After all, an internal tails/RCD set is just tri-rate pre-chopped and formed to the right length. I think the far worse crime is where you've a board which has been so badly crammed in and stressed with cables over the terminations that you need to have a solid piece of metal below them just to keep them clamped together and straight!!

I once taught a naughty builder a lesson in paying his bills by walking off site carrying (my) primary bus bar from DB1 on a large install....returned 48hrs later to find that someone had strung 2.5TE between them all instead...madness!!!!


That's my sunday morning laugh right there! - cheers lol
 
Use a bit of 6mm green / yellow cable to power up individual MCBs when testing. Hate that nasty busbar staring at me , ready to get me when I am feeling a bit tired. cannot beat a nice properly insulated cable. Seriously though it is really irritating when busbar is too short.
 
Use a bit of 6mm green / yellow cable to power up individual MCBs when testing. Hate that nasty busbar staring at me , ready to get me when I am feeling a bit tired. cannot beat a nice properly insulated cable. Seriously though it is really irritating when busbar is too short.


what i do is insulate the busbar with a couple of layers of tape.
 
MK did a retrofit kit to enable new type MCB's to be fitted to old sentry boards. It consisted of a terminal and cable extension as a busbar would not line up with old and new MCB's. Looked a bit crap but suitably rated cable and type tested so all good.
So done properly it is OK.
 

Reply to Using bits of cable as busbar in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
299
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
807
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
848

Similar threads

L
  • Question
My Understanding is the 6 Months interval is IET Guidance and this wording is incorporated onto the label which is a requirement in 514.12.2 where...
Replies
9
Views
654
Being pedantic, the Crabtree 50A cooker switch is a 4500/1, which has 'cooker' printed on it. For a shower, you require the 4500, which is the...
Replies
3
Views
333

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top