Hello guys
A client has requested I replace wiring carried out recently by a builder which consists of an SWA running from the DB, under the floor which then runs through the ventilation brick, the cable had then been run across the garden bed to the flood light mounted on the post.
I would like the dig a 600mm trench which will involve extending the cable as the floor has been laid inside the house, am i over thinking this by suggesting the cable passing through the vent brick is quite bad?
A client has requested I replace wiring carried out recently by a builder which consists of an SWA running from the DB, under the floor which then runs through the ventilation brick, the cable had then been run across the garden bed to the flood light mounted on the post.
I would like the dig a 600mm trench which will involve extending the cable as the floor has been laid inside the house, am i over thinking this by suggesting the cable passing through the vent brick is quite bad?