Adding a socket in a house where the downstairs bathroom fitters appear to have boxed in the original stopcock and 'moved' it sideways into the garage, but not moved the original bonding cable. It's now firmly inaccessible behind the toilet. The cabling at the consumer unit is also unclear.
Wander lead test to the only clean bit of copper I could find under the sink gives a reading of 0.04 Ohms (With Gas Bonding removed), but given that I can't get at the bonding cable is that considered adequate verification for a certificate?
It's a TN-S system, so thinking about it, it could be picking up continuity to earth from the buried pipe.
The owner was working from home so I couldn't isolate the entire system and disconnect the main earth to retest without. I will be returning for further works so what is the correct procedure to test bonding in an existing situation like this? Test at one point? or any and all accessible pipework?
As a bonus question, how do others deal with situations where a small job is being done that isn't directly related to bathroom or location with pipes and water or gas bonding isn't present - note that on the MWC, or refuse to do the work at all unless it's added?
Wander lead test to the only clean bit of copper I could find under the sink gives a reading of 0.04 Ohms (With Gas Bonding removed), but given that I can't get at the bonding cable is that considered adequate verification for a certificate?
It's a TN-S system, so thinking about it, it could be picking up continuity to earth from the buried pipe.
The owner was working from home so I couldn't isolate the entire system and disconnect the main earth to retest without. I will be returning for further works so what is the correct procedure to test bonding in an existing situation like this? Test at one point? or any and all accessible pipework?
As a bonus question, how do others deal with situations where a small job is being done that isn't directly related to bathroom or location with pipes and water or gas bonding isn't present - note that on the MWC, or refuse to do the work at all unless it's added?