G
GLENNSPARK
Afternoon boys n girls.....
Just been having a quick look round the install at my mothers house as this will be the site for my part p assessment.....a few things here.....some cables clipped on edge (2)...a 1.5 radial unsupported near the ceiling in the kitchen feeding a surface mounted socket on the wall (2) and one cable unsupported flying out of the wall near the ceiling which i suspect was for the feed and switch wire for lighting (2).....existing discharge batten on the wall being fed from flex to a BS1363 plugtop (2) earthing to the property is TNS hepworth braid secured to DNO sheath with a BS951.....the main bonding needs an upgrade (2) dis board is a 6 way BS 3036 (4) tails need upgrading (2) old colours (4)...etc ..etc......nothing that cant be sorted easily.....my approach here is to give it a PIR first so i can test to see if any cabling is shot..or theres the borrowed neutral etc...just to give me a starting point really......but the problem is theres not going to be enough room to fit a 10 way split load board here within the existing space vacated by the BS3036......was thinking about ringing the energy supplier to ask em if they can move their meter over a bit to give me the required room.....theres a henley block here for the MET that i can move myself....its just the meter......how do you rate my chances of being successful in getting em out to move it over for me?
Just been having a quick look round the install at my mothers house as this will be the site for my part p assessment.....a few things here.....some cables clipped on edge (2)...a 1.5 radial unsupported near the ceiling in the kitchen feeding a surface mounted socket on the wall (2) and one cable unsupported flying out of the wall near the ceiling which i suspect was for the feed and switch wire for lighting (2).....existing discharge batten on the wall being fed from flex to a BS1363 plugtop (2) earthing to the property is TNS hepworth braid secured to DNO sheath with a BS951.....the main bonding needs an upgrade (2) dis board is a 6 way BS 3036 (4) tails need upgrading (2) old colours (4)...etc ..etc......nothing that cant be sorted easily.....my approach here is to give it a PIR first so i can test to see if any cabling is shot..or theres the borrowed neutral etc...just to give me a starting point really......but the problem is theres not going to be enough room to fit a 10 way split load board here within the existing space vacated by the BS3036......was thinking about ringing the energy supplier to ask em if they can move their meter over a bit to give me the required room.....theres a henley block here for the MET that i can move myself....its just the meter......how do you rate my chances of being successful in getting em out to move it over for me?