Seems to be other doubling up going on as well.
Are they really 2 rings or a ring and a couple of spurs/radials chucked in?
From what I have seen, there's the following (left to right fuse & ratings)
1 = 5A (circuits not yet identified. initially thought to be lighting circuit for either g.floor or 1st floor but it has been proven that fuse N#2 is serving both.
2 = 5A for g/floor and 1st floor
3 = 15A (Immersion heater. 3.0Kw)
4 = 30A (ring main g/floor and 1st floor, old electrical shower has been taken from ring, no signs of fused spur.)
5 = 30A (2 radial + 1 serving the garage attached to the house, will change this to at least 6mm. one radial is serving at least one socket where fax is connected and a heat towel rail in bathroom)
6 = 30A (cooker, I do not know the cooker rating and the other is serving a fluorescent light on an external garage about 6 meters away. It seems cable has been berried on the ground.)
This belongs to a very nice gentleman (I've known him for over 10 years now, who's kind enough to let me get this up to today's standards, under the supervision, of one of my too generous college tutors. He will then certify installation.
It's a learning curve and I'm confident I can do it.
There's no pressure as I am not on a deadline. My tutor is yet to determine the go ahead provided all is safe to do so.
My initial suggestions were to change the 2.5mm cable serving garage attached to the house by at least a 6mm T&E clip direct on a 32A MCB RCD protected (about 5 meters run from main C.U. This would connect to garage dual pole isolating switch, thus avoiding the two RCDs in series issues. Yes the garage is also to be swapped by an RCD protected C.U.
Another initial suggestion was to replace the 2.5mm that serves the external garage by an SWA cable. If not, maybe due to costs, then I would have it on an RCD protected side under a 6A MCB.
So far, I have worked out that we need at least a 12 way split load consumer unit.
This will all be part of my practical assessment but more needs to be dug out as to completely understand what has been done here.
This is on a TN-C-S system.
Any opinions and/or positive constructive criticism is truly welcomed.
Regards,
Albert