Hi guys,
Im installing a main switch after a recent PIR picked up it needed one.
Should i still be completing a electrical installation cert?
and if so should i be testing and including every circuit of every board (5 in total)?
Im installing a main switch after a recent PIR picked up it needed one.
Should i still be completing a electrical installation cert?
and if so should i be testing and including every circuit of every board (5 in total)?