What is your hourly rate as a self employed electrician? (2023) | Page 4 | on ElectriciansForums

Discuss What is your hourly rate as a self employed electrician? (2023) in the UK Electrical Forum area at ElectriciansForums.net

HappyHippyDad

-
Esteemed
Arms
Supporter
Joined
Dec 18, 2011
Messages
5,349
Reaction score
6,604
Location
Gloucestershire
I did a poll last year on exactly this.

Below I have pasted what I wrote in thread last time so there is a degree of similarity. We can then see if we have changed out prices much (again, bit of fun, not accurate)

pasted...

I thought I would start a poll to see 'roughly' what the average hourly rate is for self employed electricians?

To keep it as simple as possible, forget about any 'first hour' rate you may or may not charge and just go for your rate after that.

I realise this isn't going to cover lots and lots of scenarios (quotes, domestic, commercial, location etc etc), but it's just for a bit of amusement and perhaps along the way we'll gain a very rough idea of an electrician's hourly rate.

It will be anonymous so please do answer honestly
 
If charging by points then each downlight/switch is a point. If people don't want to pay for 40 lighting points per room then maybe downlights aren't the answer!
I know what you're saying but I'm on about pricing for 6 downlights on one switch cct not 6 switch circuits and the wiring for 'em. It's not going to take as long to wire 6 in one room as 6 in 6 rooms
 
I know what you're saying but I'm on about pricing for 6 downlights on one switch cct not 6 switch circuits and the wiring for 'em. It's not going to take as long to wire 6 in one room as 6 in 6 rooms
I find that measuring out downlights (to avoid joists etc.) can be extremely time consuming.
 
Per point pricing is for much bigger jobs / new builds when you plan to be there for weeks on end and need a method of pricing for the whole job and lot.
I haven't done per point pricing in ages as most of my work is small jobs 3 maybe 4 days on the job Max so hourly works better
 
Per point pricing is for much bigger jobs / new builds when you plan to be there for weeks on end and need a method of pricing for the whole job and lot.
I haven't done per point pricing in ages as most of my work is small jobs 3 maybe 4 days on the job Max so hourly works better
Not necessarily, people constantly want prices off you so instead of sitting down for hours on end working stuff out time and time again you just give them a price per point.

That's what we do when we are doing these insurance jobs. Ours is ÂŁ60 per point, doesn't matter what it is, its ÂŁ60. The fans cost us more than ÂŁ60 to buy and sometimes so does the shower cable and pull cord, not to mention the smoke/heat alarms with lithium batteries but when a 1 gang light switch is also ÂŁ60 then it evens itself out again. Its surprising how near the total always is to what we would want if we priced the job anyway or did it on a day rate.

The exception is if its only 3 sockets in a bedroom but they take all day to do, sometimes its a non payer but most of the other bigger jobs make up for it.
 
Not necessarily, people constantly want prices off you so instead of sitting down for hours on end working stuff out time and time again you just give them a price per point.

That's what we do when we are doing these insurance jobs. Ours is ÂŁ60 per point, doesn't matter what it is, its ÂŁ60. The fans cost us more than ÂŁ60 to buy and sometimes so does the shower cable and pull cord, not to mention the smoke/heat alarms with lithium batteries but when a 1 gang light switch is also ÂŁ60 then it evens itself out again. Its surprising how near the total always is to what we would want if we priced the job anyway or did it on a day rate.

The exception is if its only 3 sockets in a bedroom but they take all day to do, sometimes its a non payer but most of the other bigger jobs make up for it.
I have never been able to make per point pricing pay me more than my ÂŁ95 per hour rate.
For example a bathroom refit with 4 spots , 1 switch and a fan you would come out at 6 points so ÂŁ360 all in ? there is no money at ÂŁ60 per point on a job like that Imo

I would probably be 4 hours + materials so a job like that say all in with decent materials nearer ÂŁ600
 
I have never been able to make per point pricing pay me more than my ÂŁ95 per hour rate.
For example a bathroom refit with 4 spots , 1 switch and a fan you would come out at 6 points so ÂŁ360 all in ? there is no money at ÂŁ60 per point on a job like that Imo

I would probably be 4 hours + materials so a job like that say all in with decent materials nearer ÂŁ600
You would probably make ÂŁ200 profit so its not the end of the world, especially if you could finish by early afternoon. Its still a grand a week if you could do stuff like that every day. I know its a different world pricing wise in london but no-one would pay anywhere near ÂŁ95 ah hour in the north, you might get away with it if it was a 1 hour call out and you got their electrics back on after them freezing to death for a day but to just wire some sockets in an extension, no-one would dream of paying ÂŁ700+ for a days work.
 
You would probably make ÂŁ200 profit so its not the end of the world, especially if you could finish by early afternoon. Its still a grand a week if you could do stuff like that every day. I know its a different world pricing wise in london but no-one would pay anywhere near ÂŁ95 ah hour in the north, you might get away with it if it was a 1 hour call out and you got their electrics back on after them freezing to death for a day but to just wire some sockets in an extension, no-one would dream of paying ÂŁ700+ for a days work.
I get what you are saying but for the example of the job I gave which is about a 4 hour job maybe 5 hours by the time you unload and then load up all your gear and tidy up etc. I would want to take more than 200 quid out of it especially if it were a fair distance from where I live.
 
On a larger job I tend to work it out per point (ÂŁ60 or ÂŁ65 depending on how I'm feeling about the job). I then have a quick think how long it will take me (adding on a few days) and see which is the highest, I then go for that one. They are generally fairly similar.

Up to a few months ago I would class each downlight a little less than a point (ÂŁ50 - ÂŁ55). I have recently just started to just class them all as a point when quoting. Although...

I'm currently fitting over 100 downlights in a customers house. I must admit that I did advise them to just pay me a day rate (ÂŁ350) as it really did seem a bit too much to charge ÂŁ6000 for just the lights!

Glad this thread is going well. We've had quite a few more on the poll, so I'll try and get around to working out the average again... when I've stopped fitting all these bloody downlights!!

Decided to quickly work it out...

Mean average hourly rate for 2022 was ÂŁ41.48
Mean average hourly rate for 2023 (so far) ÂŁ46.30
 
Last edited:
On a larger job I tend to work it out per point (ÂŁ60 or ÂŁ65 depending on how I'm feeling about the job). I then have a quick think how long it will take me (adding on a few days) and see which is the highest, I then go for that one. They are generally fairly similar.

Up to a few months ago I would class each downlight a little less than a point (ÂŁ50 - ÂŁ55). I have recently just started to just class them all as a point when quoting. Although...

I'm currently fitting over 100 downlights in a customers house. I must admit that I did advise them to just pay me a day rate (ÂŁ350) as it really did seem a bit too much to charge ÂŁ6000 for just the lights!

Glad this thread is going well. We've had quite a few more on the poll, so I'll try and get around to working out the average again... when I've stopped fitting all these bloody downlights!!

Decided to quickly work it out...

Mean average hourly rate for 2022 was ÂŁ41.48
Mean average hourly rate for 2023 (so far) ÂŁ46.30
I get what you're saying, although I charged 15 downlights a couple of years back at €80 + VAT per fitting and the customer went ahead with it. I know on paper it makes it look expensive, but to be fair it takes a lot of work to do it.
 
I find that measuring out downlights (to avoid joists etc.) can be extremely time consuming.
Must admit to a few of those in the past, always on hourly, though.
Not much domestic these days....in fact at last NIC Assessment they'd wiped me off their details regarding Part P even though I'd registered one job through them.
 
When a client says, "but I can get that done my so and so much cheaper" I always replied "go ahead with so and so if you want, but when you get in trouble, you know my contact details" inevitably they came back to me eventually if not immediately.
 
When a client says, "but I can get that done my so and so much cheaper" I always replied "go ahead with so and so if you want, but when you get in trouble, you know my contact details" inevitably they came back to me eventually if not immediately.

Relating more to previous work than electrical I've never haggled on prices quoted, but nor did I ever make any comment other than 'that's okay' when told about a cheaper option. Sometimes customers went with the cheaper price and that's fine with me. Sometimes they took 'okay' to mean 'I'll match that price' and I'd politely explain that my price wasn't negotiable. My personal favourites were those who simply looked shocked, as clearly there was no competition, and then inexplicably decided to go with your 'expensive' quote. The latter were people to tread carefully around and sometimes it felt best not to deal with them at all. I don't mind people trying to find the best possible value, but there are ways of going about doing so and there are ways which scream untrustworthy.
 
Relating more to previous work than electrical I've never haggled on prices quoted, but nor did I ever make any comment other than 'that's okay' when told about a cheaper option. Sometimes customers went with the cheaper price and that's fine with me. Sometimes they took 'okay' to mean 'I'll match that price' and I'd politely explain that my price wasn't negotiable. My personal favourites were those who simply looked shocked, as clearly there was no competition, and then inexplicably decided to go with your 'expensive' quote. The latter were people to tread carefully around and sometimes it felt best not to deal with them at all. I don't mind people trying to find the best possible value, but there are ways of going about doing so and there are ways which scream untrustworthy.
Never respond . Make excuses and move on. Ive never ever price matched a lower quote
 

Reply to What is your hourly rate as a self employed electrician? (2023) in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
717
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
1K
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
3K

Similar threads

  • Poll
Have been toying with the idea of making the first hour ÂŁ60 and hours after that ÂŁ50 This gives a leeway to discount pensioners and regular...
Replies
25
Views
2K
  • Question
You're right mate some forums have been switched (I'll explain in subscribers mate). I've got a fix.
Replies
2
Views
481

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top