What’s the going rates for the below instalation | Page 2 | on ElectriciansForums

Discuss What’s the going rates for the below instalation in the UK Electrical Forum area at ElectriciansForums.net

Joined
May 1, 2019
Messages
9
Reaction score
0
Location
London
Hi just starting out working for my self after 10 years on the rail and I’m at a total loss at what the going rates are I don’t want to go in to high .I have been asked price up to Run a supply to a Bar in a garden, but due to the location of the distribution board in the house It would be easier to install a enclosure next to the meter And split the meter tails . The run is 35m to the bar so I was going to install a 6mm SWA cable protected by a 50amp 100m/a RCBO then install a 4 way DB with a 40amp 30m/a RCD mainswitch in the bar with a 20amp radial with 5 x double sockets 1 x lighting circuit. Any advice would be greatly appreciated
 
Starting off the best way to price jobs imo is;
How much money do you need and or want a week?
Work out your hourly rate to satisfy all your bugetry needs.
Decide on a material mark up if any..
Work out how long the job is going to take you, add in the materials and price based on that..
With time you will be able to put in prices using other methods but start off basic and learn as you go along
 
What are the earthing supply arrangements?, if its tt it may well need a front end 100mA or alternativley the 30mA rcd at origin

Mini garden bar with that sort of loading will likely be well provided for on a 32A max

Depending on budget i would install a 10mm in case of future add ons, garden bars sometimes have a habit of attracting a hot tub in the future etc, i would bring this issue up with the customer

Whats the swa run like back to the cu from the cu, digging?, clipping, lifting carpet and boards in the house?

I would say a long day? Maybe a day and a half?

Materials about £400?

My cost would likely be about £850? Give or take
 
Going rate ?!

Take your list of required materials to 2 different wholesalers and get quotes from each...

£200-£250 per day labour

Add both together plus add 10% you now have your ‘price’ for that job
 
and allow a day's labour for a labourer to dig. you don't want to wreck your own back

I always tell them to get their own trench dug before I start,
I generally recommend to customers to use a local handyman/garden company for small short trenches.
 

Reply to What’s the going rates for the below instalation in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
380
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
957
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
1K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top