I have seen this red single core cable coming out of the old cast cut outs quite a few times now and just wondered what they were?

Anyone know??
IMG_0129.jpg
 
Last edited by a moderator:
Not familiar with that either. Are the head and service cable ordinary in other respects? Seems odd that they would leave a vulnerable length of unfused cable hanging out. I'm struggling to guess the size in the pic but it looks small, less than the 7/.064 that the service cable is likely to be.

Would be interested to know if it is live.
 
Yes it’s not the first one i have come across on the old iron heads with this odd looped red single core of old braided conductor by the look of it

in new money I’d say it was between 6mm-10mm

to be honest I’m not sure if it’s live or not I’ll put a wand on it when I’m back there

the head is not unusual in any other way

as mentioned maybe it’s for a timeclock or some other addition
 
Well the DNO have been in to up grade the fuse to 100A and never mentioned anything about it, I did think they may change the entire head whilst doing the upgrade but never 🙄

Can't believe they've left that loop there. Doesn't look very safe. At least needs clipping/securing.
 
As it it is a loop, might it be for an optional peak(maximum) demand recording meter and associated tariff - but perhaps very unusual in a domestic setting. Being an ammeter this would only require line in and out. I cannot find an image of an old one.
 
I've never seen or heard of an MD meter in a domestic setting, but any other metering would surely be connected after the cutout fuse inline with one meter tail, so that it is both protected and capable of being isolated. I can't see any justification for connecting anything but another fuse directly to the supply, although breaking a flying lead out of one of the spare entries in the sealing chamber is not the normal way to do that.

I wondered whether the service cable is actually 3- or 4-core. The installer might have been issued with SP+N terminal equipment and instructions to provide an SP+N connection, but had one or two extra cores available that were unconnected upstream. A stub of cable was then sweated onto the spare core(s) in case they needed to be brought into service in the future, and the fact it is physically a loop at the moment is not significant.
 

Reply to Whats this on the cut out? in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
As the holiday season approaches, PCBWay is thrilled to announce their Christmas & New Year Promotions! Whether you’re an engineer or an...
Replies
0
Views
750
  • Article
Bloody Hell! Wishing you a speedy recovery and hope (if) anyone else involved is ok. Ivan
    • Friendly
    • Like
Replies
13
Views
1K
  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
976

Similar threads

  • Question
Yes still see the odd red white and blue out in the wild, usually without cpc, iirc that colour code was only used for a short time...could be...
Replies
13
Views
1K
Brilliant. Thanks Brian much appreciate the advice.
Replies
2
Views
310

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top