Good morning all
First time posting so quick introduction
I'm John I'm employed by my.local council To carry out EICR'S
I've been in this job now for around 3 month every house I have tested has been rewired or partially rewired in the last 10 years or so
Now about the C3 and maybe this is just me because its a massive pet hate of mine
Every single CU I have looked at has the MCBS ranging from lowest to highest from the RCD for example
RCD 6A 6A 16A 32A
So I see this as a C3 as I was always taught and have always done it from highest to lowest from the RCD
My boss today asked why I C3 this as it's not a big deal
as I believe it's is the testers discretion as to what goes down on the coding and I this is something would never do
Again silly to most people I know but to me it's wrong
What's your thoughts and opinions on this ?
Thanks your friendly neighborhood tester John
First time posting so quick introduction
I'm John I'm employed by my.local council To carry out EICR'S
I've been in this job now for around 3 month every house I have tested has been rewired or partially rewired in the last 10 years or so
Now about the C3 and maybe this is just me because its a massive pet hate of mine
Every single CU I have looked at has the MCBS ranging from lowest to highest from the RCD for example
RCD 6A 6A 16A 32A
So I see this as a C3 as I was always taught and have always done it from highest to lowest from the RCD
My boss today asked why I C3 this as it's not a big deal
as I believe it's is the testers discretion as to what goes down on the coding and I this is something would never do
Again silly to most people I know but to me it's wrong
What's your thoughts and opinions on this ?
Thanks your friendly neighborhood tester John