When does labelling have priority over colour coding?? | Page 2 | on ElectriciansForums

Discuss When does labelling have priority over colour coding?? in the Commercial Electrical Advice area at ElectriciansForums.net

-Incorrect labelling kills people with no electrical knowledge as the public rely on it to be correct when switch off circuits etc..
-Incorrect colour coding kills electricians who should know better due to complacency and skipping the appropriate tests that would verify the correct colour code.

That is why in my opinion. :)
 
-Incorrect labelling kills people with no electrical knowledge as the public rely on it to be correct when switch off circuits etc..
-Incorrect colour coding kills electricians who should know better due to complacency and skipping the appropriate tests that would verify the correct colour code.

That is why in my opinion. :)
All well and good DW, this doesn't really need saying, but I'd be interested to know how you would connect the compressor in the OPs photo and what dead tests will identify phase conductors.
 
OK, so I was on hold to Daikin tech for so long that I actually read the manuals.... hidden in the VERY small print of the fuse/isolator schematics that we'd normally all skip past it does actually say Br-Gry-Blk - on all devices - not just this random one that I found labelled. So had I not been paying attention ? then I'd have inadvertantly wired about 90% of the plant room phase reversed for the kit that's in it.

Make of that what you will..... (but I'm not impressed by Daikin!)
 
All well and good DW, this doesn't really need saying, but I'd be interested to know how you would connect the compressor in the OPs photo and what dead tests will identify phase conductors.
Although my comment was just jovial the markings in this particular case are irrelevant because the phase rotation of the supply cannot be determined by the manufacturer of the compressor, those markings shouldn't be applied at all imho and may lead to incorrect wiring and possible less experienced sparkies walking away expecting the motor to be going the correct direction and in fact it could be going the wrong way, this is applicable regardless which order the L1 L2 L3 is marked up.
 
OK, so I was on hold to Daikin tech for so long that I actually read the manuals.... hidden in the VERY small print of the fuse/isolator schematics that we'd normally all skip past it does actually say Br-Gry-Blk - on all devices - not just this random one that I found labelled. So had I not been paying attention ? then I'd have inadvertantly wired about 90% of the plant room phase reversed for the kit that's in it.

Make of that what you will..... (but I'm not impressed by Daikin!)
Change the other 10% around and then swap the supply rotation ;)
 
I suspect many new 3-phase A/C are inverter driven so they probably don't care about the incoming phase sequence. But that is not an experiment I would try!
 
You do wonder if there is a reason, like a monumental c**k-up with some manufacturing and someone worked out it was cheaper to put on labels and re-print the manual?
 
You do wonder if there is a reason, like a monumental c**k-up with some manufacturing and someone worked out it was cheaper to put on labels and re-print the manual?
Or maybe he who labelled just dropped one. Checks and tests?.....well it works OK!
Visual was a presumption.
 
The plot thickens.... having just come to actually wire it, the flex is just there as a courtesy, I have to terminate it internally as well. So..... do I correct it to U.K. convention and avoid a heap of labelling and possible confusion in the future or leave it Belgium??!

[ElectriciansForums.net] When does labelling have priority over colour coding??
 
Sealing the deal..... the other two units don’t even have the internal flex installed! ?

[ElectriciansForums.net] When does labelling have priority over colour coding??
 
To my mind, if they are not even going to connect the flex up then they should supply the units without it. Then the installer can decide what is suitable for the particular install.
 
It actually gets worse.....

Wiring Diagram inside the cover door:
[ElectriciansForums.net] When does labelling have priority over colour coding??

Now the manual:
[ElectriciansForums.net] When does labelling have priority over colour coding??

Sod this on a Friday, I’m off for a cold one!!

(NB... this will all get done to U.K. standards on Monday).
 

Reply to When does labelling have priority over colour coding?? in the Commercial Electrical Advice area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
340
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
877
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
1K

Similar threads

  • Question
No it is not implying it is safe, it is stating what the recommended date for the next inspection is. The next inspection date sticker doesn't...
Replies
10
Views
2K
davesparks
D
I like the plan. Best of luck.
Replies
6
Views
459

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top