What you can't see Biff is all the lead sheaths are linked together with large stranded unsheathed cable that goes to a large stud on the panel some 10 inches below ground level. Bitch to get to. That Aluminium outgoing cable is connected to that, and so is the earth to the KMF. The lead sheaths themselves are earthed by the DNO.
Hope that clears thing up for you my Dear.
x
no it ****in well doesnt lol.
if youve rewired the cabinet i would have expected an earth block & label ( value £2 ) to facilitate future testing as per the local authority spec , especially as the existing stud is in an inaccessable place.
and the door will require earthing seperately in 6mm tri-rate.
hope that sets things straight x.
Don't new streetlights all have their own RCD's in now?