I had a job for a friend. Install 6 cctv cameras. I ordered the correct size clips and planned the position of the cameras. The cameras where mounted on JB boxes which meant I could keep the connections away from the elements.
All cables where ran to one corner if the house and then into a Schneider JB. This is where it went wrong.
I didn't realise that all the knock outs where 25mm. I didn't have any 25mm glands so I had to go and get some.
Managed to get some and upon screwing them in it was obvious the moulding on the inside would not allow 2 25mm glands next to each other.
I spent the next 2 hours cutting away at the inside of the box, shaving the glands down.....just trying to.make it work.
It really frustrated me and its a lesson to take more notice of how the install which pan out before attempting to install
All cables where ran to one corner if the house and then into a Schneider JB. This is where it went wrong.
I didn't realise that all the knock outs where 25mm. I didn't have any 25mm glands so I had to go and get some.
Managed to get some and upon screwing them in it was obvious the moulding on the inside would not allow 2 25mm glands next to each other.
I spent the next 2 hours cutting away at the inside of the box, shaving the glands down.....just trying to.make it work.
It really frustrated me and its a lesson to take more notice of how the install which pan out before attempting to install