Hi there, hoping someone can clear this up for me.
A company has had a PIR done, he has found circuits which require rcd protection etc.
Now, I have a friend within the co. who has shown me the quotes and to cut the story short I said I will beat them blahblahblah I have got the job.
The quotes are to upgrade the DB from an 8-way 3 phase to 12-way 3 phase with RCBO's and a few other minor things then test relevant circuits. This is one board out of three in the installation. Obviously this is not like for like.
I have no issues with why he has got round the situation this way or anything like that, im going to do the work on the quote only.
My question is which certs need to be carried out and issued after completion of work???
Is it another periodic but only for the DB + circuits that have been changed???
Also, how much would this cost, ballpark, its 9 circuits in total being put into the 12 way board inc. 9 RCBO's.
Going to put in my price and want to know how much to set aside.
Thanks for any input, much appreciated. Rik
A company has had a PIR done, he has found circuits which require rcd protection etc.
Now, I have a friend within the co. who has shown me the quotes and to cut the story short I said I will beat them blahblahblah I have got the job.
The quotes are to upgrade the DB from an 8-way 3 phase to 12-way 3 phase with RCBO's and a few other minor things then test relevant circuits. This is one board out of three in the installation. Obviously this is not like for like.
I have no issues with why he has got round the situation this way or anything like that, im going to do the work on the quote only.
My question is which certs need to be carried out and issued after completion of work???
Is it another periodic but only for the DB + circuits that have been changed???
Also, how much would this cost, ballpark, its 9 circuits in total being put into the 12 way board inc. 9 RCBO's.
Going to put in my price and want to know how much to set aside.
Thanks for any input, much appreciated. Rik