Working at safe height & manual handling? | on ElectriciansForums

Discuss Working at safe height & manual handling? in the Solar PV Forum | Solar Panels Forum area at ElectriciansForums.net

M

mark da spark

Hi,
I am in the process of getting MCS accredited. I was told I need to get a manual handling & working at safe height certificate. I have done my city & guilds 2372 which covered both but is it enough for MCS or do I need to sit both courses? Any help would be much appreciated.
Cheers, Mark
 
If you have a certificate saying working at height and manual handling then you got it. If not then you need it. MCS = documented evidence! 2372 may of covered it but that does not mean they have certified you for it. Best check your certs.
 
Thanks for the reply. I'm waiting for my college to get back to me about my cert to see if it is included or not. Will chase it up tomorrow again.
Cheers
 
MCS001 requires personal to be suitably trained and qualified. It does not state directly you must have W at H or MH nor does it state you need to be qualified in PV or alike but you are!
 
MCS001 requires staff to be trained and competent. There is no requirement for qualifications and they will accept experience on the job: I have been through an ELECSA MCS assessments and don't have W at H, MH or PV certificates (admittedly I have degrees in renewable systems technology and electrical engineering and have been on a MIOSH approved H&S course but they never asked to see certificates).
 
I always get the qualified wrong with competent. I've seen numerous works by qualified persons who aren't competent and vice versa.

NICEIC wanted to see our certs. Pity all the providers aren't working off the same set of rules.
 
We're getting accredited with Napit and waiting for them to let us know if we do need both certificates or not.
You would think it should be the same criteria with all the MCS providers but it's not the case by the looks of it!
 
if you need a cert, do an online course then print out your cert and put it in your training file. Waste of ÂŁ25, but it ticks the box.
 

Reply to Working at safe height & manual handling? in the Solar PV Forum | Solar Panels Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
223
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
683
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
625

Similar threads

I have recently completed my Level 2 & 3 in Electrical Installations & hold an ECS card, I'm struggling to find a way into the industry I though...
Replies
0
Views
650
Thank you for your response. I really appreciate it.
Replies
13
Views
732

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top