Working in live enclosures | Page 6 | on ElectriciansForums

Discuss Working in live enclosures in the UK Electrical Forum area at ElectriciansForums.net

I

industryspark

TPN switchfuse bolted onto a busbar chamber. Bottom half (supply terminals) live and covered by the manufacturer fitted shield. Cables to be connected to the top load terminals. Some sparks i know would happily work on the top terminals even though the enclosure houses live, albiet shielded terminals.............opinions?

Regards
 
can't see what all the fuss is about. next thing we know is HSE will be banning us from driving if the engine is running.

If HSE had any jurisdiction on transport, there wouldn't be a single vehicle on the road.

Unguarded machinery under the control of poorly trained operatives covers it.
 
We had a guy badly burnt by arc flash, they didn’t get involved. Surprising I know but it saved us a lot of hassle and paperwork.
i thought the hse only really got involved if there was a death, someone suing the company or enviromental hazard rtc

i got a nice scar on my hand, when i cut it then accepted all blame in paperwork e.g accident book etc (filled it in only because boss was ****ing me off over it)

so he got an earful and a lot of emails etc, if he didnt moan etc it would of been a case of take more care next time and carry on.
 
We had a guy badly burnt by arc flash, they didn’t get involved. Surprising I know but it saved us a lot of hassle and paperwork.

I once committed the cardinal sin of issuing 2 permits to work on the same LV system nearly blinded a jointer. so I don't take chances anymore, it was a humbling experience HSE all over me APs ticket revoked for 6 months.nearly causing someone else to be killed brings safety into perspective. been there done that got the T shirt never again.
 
I once committed the cardinal sin of issuing 2 permits to work on the same LV system nearly blinded a jointer. so I don't take chances anymore, it was a humbling experience HSE all over me APs ticket revoked for 6 months.nearly causing someone else to be killed brings safety into perspective. been there done that got the T shirt never again.
if you dont mind me asking, how did the two permits cause the issue?

im not sure i follow how it happend?
 
I have not read all the posts but from the first page it would seem that the question being asked would apply to all 3 phase single phase Consumer units, so are you all saying we shouldn't work in them? as apart from new installations there is no means of isolating the supply from the meter is there ?
Or am I not reading the question correctly ?
 
if you dont mind me asking, how did the two permits cause the issue?

im not sure i follow how it happend?
Closed one powered pack up with one permit still valid and guys still working, not the right thing to do, it was a long long time ago but I still think about it when ever I lock off and isolate, so when people say we do it every , work live that is, it makes me see red, no I don't mind you asking at all if it makes people think the all the better as far as I'm concerned
 
i thought the hse only really got involved if there was a death, someone suing the company or enviromental hazard rtc

i got a nice scar on my hand, when i cut it then accepted all blame in paperwork e.g accident book etc (filled it in only because boss was ****ing me off over it)

so he got an earful and a lot of emails etc, if he didnt moan etc it would of been a case of take more care next time and carry on.

List of reportable incidents and injuries .......
Reportable incidents - RIDDOR - HSE
 
I have not read all the posts but from the first page it would seem that the question being asked would apply to all 3 phase single phase Consumer units, so are you all saying we shouldn't work in them? as apart from new installations there is no means of isolating the supply from the meter is there ?
Or am I not reading the question correctly ?

If the live incoming cables /terminals are adequately shielded, as most have been for a long time and your own risk assessment doesn't throw up any other hazards then yes it's O.K to work in such boards.
 
List of reportable incidents and injuries .......
Reportable incidents - RIDDOR - HSE
it wasnt reportable under riddor, i carried on working and was back in again the next day.

i just got a little scar to remind me to wear gloves why doing trunking

i filled it in because boss was being a cee you next tuesday so i filled it in.

anyone looking at it can see its a joke.

first aid administered - none

days off work - none

lol
[ElectriciansForums.net] Working in live enclosures
 

Reply to Working in live enclosures in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
299
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
807
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
851

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top