- Joined
- Dec 31, 2010
- Messages
- 2,216
- Reaction score
- 1,052
What do we do about testing for ZS on a TT system? sorry, but never covered this in college. I know Ze should be below 200 ohms, and that the max Ze can be 1667 to give disconnection time when covered by 30mA RCD. But I've never given thought to actually testing and certifying a TT installation. What do you put on the form? Do you even test Zs at live points?
Sorry if this seems a bit basic, but college only covers TN system testing and I don't really deal with much TT.
Sorry if this seems a bit basic, but college only covers TN system testing and I don't really deal with much TT.