T
thepurple1
Hi I work in the controls industry as a commissioning engineer so I dont get involved in the installation.
Anyway I have a house rewire to do it the first one in about 5-7 years I have a brown 16th Edition onsite guide could any on tell me if the table values in this book on page 92 are the same as the new 17th edition.
thanks
Anyway I have a house rewire to do it the first one in about 5-7 years I have a brown 16th Edition onsite guide could any on tell me if the table values in this book on page 92 are the same as the new 17th edition.
thanks