IMO is should go back to the C&G 236 days all done on practical assignments and coursework and written obviously, if a fail in any of these it was no pass.
I done NVQ for my gas portfolio etc it was easier.
I worked for this company and can tell you we were never allowed to connect tails on the outgoing side of the isolator.This was the job for customers electrian. Something don't add up see it's been sealed up on the incoming. Obviously talking about new connections.
Job that was on the to do list, got round to it the other day. Three gang switch with a few lights connected together in the same switch.
Surveyed the job lucky all wiring went back to the switch LN in there too.
Got double dry lined box 6 gang switch linked all commons up and gave SL to each...
E7 times are normally 12 midnight till 7am, however teli switching/ integral time clocks in meter are staggered by approx 30mins so loads across the grid are not simultaneous. I always advise setting timers etc to the actual time on the meter not your own clock or watch.
Its sensible you chose...
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc