Recent content by Risteard

  1. Risteard

    Fitting an 'APT Timer' to a dual Immersion Heater

    As above, it has to go before the bath/sink switch. As you are in Ireland you should consider getting a REC to do this. Bear in mind that this cannot go in the hot press - if your installation is a number of years old then that is likely where the current immersion switch is. Also an immersion...
  2. Risteard

    Does anyone have IET membership?

    I'm a member (technician member). It gives you a third off publications which is a real benefit. Can't remember fee off-hand.
  3. Risteard

    Electrician starting advice

    Always had a JIB card. Asked for it a couple of times, often with agencies etc. However strangely those asking for it generally aren't actually prepared to pay the JIB rates of pay. Go figure.
  4. Risteard

    Recording SPD install on EIC

    Fair enough. It's on NIC certs.
  5. Risteard

    Help wiring a ceiling rose

    Aye, a REC is a Registered Electrical Contractor, i.e. one registered with RECI (the Register of Electrical Contractors of Ireland - also operating under the name Safe Electric).
  6. Risteard

    Help wiring a ceiling rose

    OK, but my original advice stands to have the installation inspected by a REC. You can find a list on www.reci.ie or www.safeelectric.ie
  7. Risteard

    Stroma Certification Scheme NAPIT bought out Stroma?

    It all sounds like a bit of a Storma in a teacup.
  8. Risteard

    Recording SPD install on EIC

    It is - 7.10 and 7.11 on it.
  9. Risteard

    Recording SPD install on EIC

    7.10 and 7.11 - I'm using NIC certs so not sure whether it's numbered the same on whatever you're using.
  10. Risteard

    Predicament do i ?

    Woodies are a major DIY store in Ireland. What cracks me up though is that (leaving Restricted Electrical Works aside for a minute and whether they should be selling electrical equipment at all) they don't sell new Irish Standard T&E but the BS cable only (or at least the last time I checked)...
  11. Risteard

    Acceptable departure?

    Try NAPIT technical. :tearsofjoy:
  12. Risteard

    Recording SPD install on EIC

    You can pull out the SPD modules to eradicate them from insulation testing. Then just slot them back in.
  13. Risteard

    Recording SPD install on EIC

    There is nowhere on the Schedule of Test Results for SPD information if that's what you are asking. You could write in the details of the installation work that an SPD was fitted, but aside from that there's not much else to add. (Don't forget to tick the box RE: the indicator for the SPD in...
  14. Risteard

    Admin charge for copy of MEIWC

    For a start neither paper certs nor NIC Cert Software (Clik) certs are done on their software, so these would never be sent to them. It also isn't a requirement to use NIC certs so that opens up the possibility of any other software or paper-based cert being used. Of course they have no access...
  15. Risteard

    Realistic cable size for voltage drop

    I think you'll find that the 3%/5% is not actually a requirement, but forms part of an Informative Appendix (and therefore might be seen as best practice). The actual requirements for voltage drop don't specify any specific permissible drop for BS7671 installations.
Best EV Chargers by Electrical2Go! The official electric vehicle charger supplier.

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Advert

Back
Top