Evening All. I am about to carry out a domestic rewire to a property which has TNS earthing. The DNO has recently done a bit of work installing a new isolator, smart meter, contractor for Econ 7 switching etc and tidied up their end of things a bit. There is no MET at present and everything (Main bonding and main earth) seems to have been earthed at the incoming sheath. Pity DNO didnt install a new MET but they didnt.
Am I allowed to connect to their sheath directly or should I ask them to provide a MET and the 16mm from this to their sheath? I would prefer to have a MET, just looks tidier than the connection direct to the sheath as currently made in the attached photo.
Am I allowed to connect to their sheath directly or should I ask them to provide a MET and the 16mm from this to their sheath? I would prefer to have a MET, just looks tidier than the connection direct to the sheath as currently made in the attached photo.
Last edited: