Hi guys new to the forum. I’ve landed on a job on a dental surgery. The plumbers have installed new heating and got water system and basically left me to wire it up. Struggling to get my head around it and could do with some help. They’ve installed two boilers that are going to work together, two pumps one for c/h one for h/w. There’s three zone valves two for downstairs and one for upstairs. There’s also a h/w cylinder with a cylinder stat. They then want three room stats for c/h two downstairs and one upstairs. Any would be appreciated cheers