i have read the dti and just need some one to explain it to me abit better please.
if i install a 3.60 kw system on a single story roof do i need to earth the frame work, if so how do i earth it, do i take it back to the main pme earth or do i have to run a seperate earth to a earth rod
if i install a 3.60 kw system on a single story roof do i need to earth the frame work, if so how do i earth it, do i take it back to the main pme earth or do i have to run a seperate earth to a earth rod