thanks for replies yes 200a blocks checked
the reason I was wanting to code was the fact that someone may replace a fuse in one of the iso for +80 and then we have an issue
which is quite possible as I found a fuse wire in a sub board had been replaced for a bit of 2.5
bit of reassurance on coding
I have 3 phase 3x150a (checked with supplier) incomer feeding meter in 50mm tails- 5omm tails to 3x blocks from meter
from each block tails to various isolators all not exceeding 1m in the same cupboard, the highest fused isolator at 60a being fed with 16mm and...
Hello people
i I need some help with motor connections I need to replace a tyre machine motor, I have the new motor but it's not quite the same I have a 4 pole 1hp motor cap/run/start the wiring on it shows how to wire in two opposite directions problem I have is you can only choose one or the...
that is great its a very old machine think safety's on this are none existent
i do allready have 4 wires from pedal to the motor as far was i could work out it was one l&n for one direction and one for the other I'm assuming one l&n to z2 and u1 and the other to v1 u2 or would this be incorrect
hi thanks for the replys I'm not sure how to get a picture up of the wiring instructions but i will try to explain
clockwise rotation N=z2 link to U2 Sc between v2 z1
L=U1 link to v1 Rc between v1 z1
Anti clockwise L=u1 to z1...
Hello people
i I need some help with motor connections I need to replace a tyre machine motor, I have the new motor but it's not quite the same I have a 4 pole 1hp motor cap/run/start the wiring on it shows how to wire in two opposite directions problem I have is you can only choose one or the...
Hello people I have a adt non monitored system I am after the master code and engineer code
Mine is playing about and the ex adt guy I have lost his number so can't get hold of him
and yes I know that no one is going to post on an open forum so if someone could help message me thanks
and it's...
That's right and you should use the rt therminal
So live to programmer link to 1 then 4 on programmer to 1 on stat. 3 on stat to rt then your neutrals and earths of course
If you running a 3 port you would need it to be sprung return for this to work . So you need to either change the valves or the programmer
You could of course fit a relay to it for it to motor over when off
riello ups 6500kva power daily plus | eBay
6500va ups system with two battery box towers and change over switch
All batteries are with it still in separate original boxes but as this unit was bought 5-6 years ago I'm unsure if they will be ok
All was bought brand new as said 5-6 years ago...
Generally you should keep them apart in all cases but if there are not options other than to run them together your signal cable should be a screened cable to reduce any interference