Is it just a empty plastic box? I had one just like this on a site where trunking was being installed the lads i worked with basically went around the box with the trunking from one side up over the top and back down like a arch and carryed on and when i went to look at it i pointed out it was...
A 6mm cable might be suitable for the load but im pretty sure it wont wont the current carrying capacity for a 40A mcb once derating factors have been taken into account. Also i was always under the impression that a jacuzzi needed rcd protection as most manufactures recommend als if you are...
I have not done the 2391 so i may be wrong but surely you can still do the Ze as the incoming teminals will still be live as you have only turned off the main isolator but the tails are teminated into that so you still can do Ze and pfc without asking to power up.
Also its never too late i went to college when i was 23 and paid my self through college while working for agancys as a mate, i did not get my first actual job with a company till i was fully qualified. There was also a guy on my course doing the same as me and he was 52 so like i say its never...
Dont be so honest mate, put on ya cv you have a little bit of experience nothing big (every one lies a bit on the cv) say you have 2nd fixed sockets or something small like that. Then go to agencys and say yes you can do this and that just to get your self on a site. It might not be the best way...
Totally agree with 123 above thats that i was going to say. You can download maps for offline mode i have the full england google maps downloaded to my android phone that i downloaded on my wifi at home so i dint use any data at all on maps and they update when needed aswell
I do agree with ya mate, i however have no intention of quiting and doing another job but i do agree that they are just pushing them out and they will probily just keep doing it every few years as they know we will have to buy there books and also take the courses as we have to have them to be...
Have you done any testing? Check there is no short to earth. You say every thing is the same but how can it he if you have taken away the power from the ring and put a new cable in to feed it.
Sounds like maby the cable is damaged and needs to be tested.
If you used twin and earth then it is...
At my previous job i had about 4 hours for the test and inspect, and that was including paperwork (which was actually on a tablet) and i think that was a push you basically had to run every where none stop that is one of the main reasons i left.
1 hour is a stupid time scale to me how is it...
Apply with agencys for either mate or improver work. Get your self either a cscs card or ecs card if you dont have one and you will be sorted thats the way i did my nvq. Also send cvs off to companys some do take on improvers or mates instead of apprentices
What is the voltage present? Have you measured it to see what voltage is there. Also have you checked the continuty of the said pipework to the met/ earth teminal to be sure it is actually bonded as it could not be
This is going to sound like a stupid question and i am sorry but how did you get a bad elbow because of the work we do? I understand about bad knees and that from no pads while crawling on beams and solid floors with screws on them and that but dint get the elbow bit.
And im only 29 so i...
What is the unit of the 2357 this plan is off? As from what i remember from my 2357 is the design units was basically a blank plan of the building and stated dimensions like height and lengh of the building and also stated what the supply characteristics was and where it was located and you...
The 10mm to the water i would test the continuity of it to the MET as if the reading is less than 0.05 ohm i would just code it a C3 as cant find bonding clamp if not (within reason) then would C2 it.
The door frame i would also code a C3.
The switch where the earth is not connected but is...
It sounds like you mean having a split board with 2 rcds and then putting a rcbo in place of one or more mcbs and in this case i would say no as you would have 2 30mA rcd one after the other, get a high integrity board so you still have the rcd parts plus another part for the rcbos
It sounds like the property has a high demand and may be useing more that 100A which is causeing the fuse to overload and blow, might want to get a clamp meter and check how many amps it is pulling.
I am not going off a previous reg to be honest i didnt even know the reg existed i am going off what i think would be a resonable assumption if i see sockets without near a back window or door or somewhere like that and there is a electric lawn mower in the back yard i am going to resonably...